Get instant price comparisons for Asbestos Surveys
When you complete this form, you will instantly get a list of Asbestos Survey experts in your local area, together with an estimate of the price for the Asbestos Survey. There is no middle man - you deal directly with the supplier of your choice. Your details are not passed on to any third party other then the Energy Assessors listed, and we will not add you on to a mailing list. Apart from an email asking you for feedback, we will not contact you again.
Asbestos Surveys
Asbestos was used in UK construction from the early 1900s. It was used extensively in building materials from the 1950s through to the 1980s and wasn't banned in the UK until 1999. Due to the fact that asbestos was so popular as a building material, any structure built or refurbished within that period is likely to contain asbestos.
Asbestos-containing materials (ACMs) are either known to contain asbestos, or presumed to contain asbestos.
The purpose of an Asbestos Survey is;
- To find ACM and record the type of material, its location and the quantity involved
- To record how easily accessible it is, its condition, and any surface treatment it has received
There are two types of survey for ACM
Management survey
The Management Survey is required to manage ACM during the use of premises under normal working conditions and ensures that;
- nobody is harmed by the continuing presence of ACM
- that the ACM remains in good condition
- that nobody disturbs it accidentally
The Management Survey should highlight ACM that could be damaged or disturbed during
- normal day to day activities
- future routine maintenance
- the installation of new plant or equipment
A management asbestos survey is required on any non-domestic buildings or shared parts of domestic buildings built pre 2000.
Demolition or Refurbishment survey
The Demolition or Refurbishment survey is required where premises or equipment are in need of refurbishment or demolition. There is no requirement for the Survey to record the ACM condition, but should ensure that;
- no one will be harmed by ACM due to work being carried out on the premises or on the equipment
- such work will be done by a suitable contractor in a proper manner
The Demolition or Refurbishment survey should identify all ACM before any structural work begins. The area surveyed must be vacated, and certified 'fit for reoccupation' after the survey.
You need a refurbishment and demolition asbestos survey before carrying out construction work. This must be carried out on any building built before 2000
The above surveys are the responsibility of the Duty holder. The Duty holder as described by the Health & Safety Executive, is the owner of the non-domestic premises or the person or organisation that has clear responsibility for the maintenance or repair of non-domestic premises, for example through an explicit agreement such as a tenancy agreement or contract.
Full details on all of the above can be found on the Health & Safety Executive website - https://www.hse.gov.uk/asbestos/surveys.htm
Before appointing a supplier and placing an order you should ensure that your chosen supplier has satisfactory qualifications, accreditation, experience and insurance to provide the level of service that you require.